Roof Restoration at Grade I Listed Browsholme Hall, Clitheroe

The Grade I Listed Hall Browsholme Hall in the heart of the Ribble Valley, is a privately owned Grade I Listed Elizabethan house, named as Lancashire’s oldest family home. Construction of the hall dates back to the original house which was built around 1507 and is arguably the finest surviving antiquarian interior in England. Browsholme

Roof Restoration at Grade I Listed Browsholme Hall, Clitheroe Read More »

St Oswalds Church Warton Lime Harling

St Oswalds Church, Warton

Located 20 minutes north of Lancaster, grade II listed St Oswald’s Church stands in the heart of the village of Warton and has served the local population for over 600 years. There has been a church on the site for over 1000 years and the ruined remains of the medieval rectory still survive next to

St Oswalds Church, Warton Read More »

Brierfield Methodist Church

Brierfield Methodist Church

Brierfield Methodist Church is a Grade II listed building built circa 1861. Repair works were required to prevent the wall and copings from becoming unstable. Most of the repairs were funded through the Heritage Lottery Fund grants for places of worship scheme. An asbestos survey was carried out by a specialist company prior to any

Brierfield Methodist Church Read More »

Anderton Boat Lift

Anderton Boat Lift

The Anderton Boat Lift is a two caisson lift lock linking the Trent and Mersey Canal and the River Weaver. The boat lift was built in 1875. It was in use until 1983 when it was closed due to corrosion. Recent restoration work was carried out and the boat lift was re-opened in 2002. The

Anderton Boat Lift Read More »

leigh spinners mill roofing repair lead work

Leigh Spinners Mill

The Leigh Spinners Mills is Grade II* listed and is one of the finest mill buildings in the country. It is an intact double mill complete with engine houses, mill lodge and chimney. The East block was built in 1913 and the West block was built in 1923. At peak production the mill contained over

Leigh Spinners Mill Read More »

bullhouse chapel restoration 25

Bullhouse Church Restoration

In May 2013 we won the contract to restore this Grade 2 II Listed church building. Works started on the church August 2013. The restoration project was to take 12 weeks to complete. Our restoration team travelled daily into Yorkshire to to conduct the work. The church is located in a small village in Yorkshire called

Bullhouse Church Restoration Read More »

herd house roof extension 2

Herd House Roof Extension

On this project we applied a roof to a newly built extension and made vital repairs to the existing roof.  The house extension was constructed to the same dimensions as the existing house. The original farmhouse has a stone slate pitched roof. The stone extension was constructed to the same roof-line as the existing farmhouse. The

Herd House Roof Extension Read More »

Scroll to Top